  1. Computer Aided design of Geosynthetic Landfill systems (IITB Model).
  2. Design of Geosynthetics Reinforced Soil Walls.
  3. Design Charts for Geosynthetics Encased Stone Columns.
  4. Design of Geosynthetic Reinforced Airfield Pavements.
  5. Design of Geosynthetic Reinforced Soil Pavements.
  6. Design of Geocell for Road Construction.
  7. Use of prefabricated vertical Drain (PVD) in Land Reclamation Projects.
  8. Design of Geosynthetic Reinforced Geofoam for Roads and Retaining Wall Construction.
    (The above design and research projects have been developed  at IIT Bombay)
  1. A comprehensive Report on the Reinforced Soil Retaining Walls for four Laning including Strengthening of existing two lanes pavement from Gurgaon on Naryana (Km. 36.630) to Kotputli in Rajasthan (Km. 162.500) on NH-8, under National Highway Authority of India, 2003.
  2. Design of Raw Water Reservoir at Ispat Industries Ltd. Dolvi 2002.
  3. Consultancy for Channel Protection Work at J.K. Chemical Nalla, Mumbai Municipal Corporation 2000.
  4. Design and Construction of Road Work using Geosynthetics at Dolvi Plant Complex, 2002.
  5. Report on Ground Improvement for Approaches of the Flyover for Development of Adequate Road Connecting to Visakhapatnam port; 2004.
  6. Construction of additional link in Visakhapatnam port- RAMP-CA. (Design for RAMP-Left and Right side Walls). 2004
  7. Report on prefabricated vertical Drain for Soil Improvement at Chain age 17.60km (Project: Widening of 4-6lanes and strengthening of existing 2 lanes carriaway of NH-6 in the state of WB from km 17-6 to 72.00 package WB-1, 2003.
  8. A Comprehensive Report on the Reinforced Soil Retaining Walls for four Laning including strengthening of existing two lanes pavement from Raniganj (Km 474.00) to Panagarh (Km 515.236) section of NH 2, in West Bengal. Under National Highway Authority of India, 2001.
  9. Remedial measures for the Settlement Problem in River Water intake RCC Tunnel for overseas project. TPK (India), 2002.
  10. Consultancy Report on Design and Detail Engineering for the Construction of Reinforced Soil approaches to R.O.B at Ch. 97.900 on NH-8 for 4 Laning of NH-8 from Gurgaon to Kotputli, NH-8. Under National Highway Authority of India.
  11. Construction for installation methodology and supervision for Reinforced Soil Structure for Approaches of ROB at Murtizapur, 2000. Consultancy for design of Reinforced Earth Wall for the construction of R.O.B. at Hasanpura Road Railway Crossing near Jaipur junction Railway Station at Jaipur


















The above design and research projects have been developed and used for the different projects in India.